Room In Hotel Project

Supply And Installation Of Coolex DX Split Units At Room In Hotel, Salmiya, With 472 TR Capacity. Integrated HVAC Solutions By Al-Quds Company.

Contact US
Client Name فندق رووم ان
Project Value -
date 2026-03-01

The supply and installation of DX Split AC units have been successfully completed at the Room In Hotel, located in the Salmiya area. The project aimed to provide a high-efficiency cooling system that ensures a comfortable environment for guests throughout the year.

Unit Details & Execution

The project involved the installation of Coolex air conditioning units across all floors and rooms. Special attention was given to achieving optimal air distribution across various spaces to ensure comprehensive coverage and high-performance cooling.

Execution followed approved technical standards, with a focus on precision during installation and operational efficiency. This ensures system stability, reduces energy consumption, and maintains balanced air distribution with consistent temperatures—meeting the demands of continuous, 24/7 hotel operations.

Project Specifications

  • Project Name: Room In Hotel.

  • Location: Salmiya Area.

  • Systems: DX Split Units.

  • Total Capacity: 472 Refrigeration Tons (TR).

  • Brand: Coolex.

Why Al-Quds Company?

Through this project, we delivered an integrated solution that balances powerful cooling with the quiet operation essential for hospitality environments. From selecting reliable equipment to professional installation—ensuring perfect airflow and easy maintenance—this project marks another milestone in our track record of excellence in HVAC system installations.

 

Search

Project Solution

What distinguishes DX Split air conditioning systems in hotel facilities?

They combine total silence for guest comfort, independent temperature control for each room, high energy efficiency, and ease of routine maintenance.