Revival of Islamic Heritage Society HVAC Project

Explore The RIHS HVAC Project. 78-ton Cooling Power With Silent, Efficient Performance. See How Al-Quds Delivers Precision And Comfort In Every Unit.

Contact US
Client Name -
Project Value -
date 2026-03-07

At Al-Quds Company, we go beyond simple HVAC installation to provide integrated thermal solutions that combine sustainable performance with user comfort. We are proud to showcase one of our field achievements at the Revival of Islamic Heritage Society (Al-Dahar Branch), where engineering precision meets executive efficiency.

Execution Phases

  • Strategic Unit Placement: Outdoor units were strategically distributed across the site to ensure maximum airflow and prevent heat buildup between units, thereby extending the operational lifespan of the compressors.

  • High-Performance Cooling: We implemented a DX Split System with a total capacity of 78 Tons. This ensures full coverage for all society facilities while providing independent control for each wing to optimize energy consumption.

  • Premium Equipment Selection: We prioritized SKM brand units for their superior ability to withstand extreme climatic conditions while ensuring quiet and stable operation.

  • Precision Piping & Insulation: Copper and electrical lines were insulated and extended according to standard specifications to minimize cooling loss and prevent future leaks.

Technical Project Details

  • Project Name: Revival of Islamic Heritage Society Project.
  • Location: Al-Dahar Area.
  • Unit Type: DX Split Units.
  • Total Capacity: 78 Tons.
  • Brand: SKM.

Search

Project Solution

What are the risks of poor insulation for HVAC piping

Inadequate insulation causes cooling loss, higher energy bills, and potential future leaks. We follow strict standards to ensure maximum efficiency and leak prevention.